As of November 20, 2021, the following works have been
conducted:
– installation of sewer networks
– installation of power supply networks
– installation of sewage system
– Installation of cement screeds for floors
– installation of door units
– Installation of solid-fired boiler
– installation of accumulator batteries to ensure boiler operation