Main works that have been conducted in September:
- Installation of immobile working platforms for restoration works at the axes B-E, 1-4
- removal of the mineral and biological contamination from the front sides of the building
- Restoration works at the front side of the observatory building
- Reproduction of the blockworks and quarry stone