Main works that have been conducted in September:

  • Installation of immobile working platforms for restoration works at the axes B-E, 1-4
  • removal of the mineral and biological contamination from the front sides of the building
  • Restoration works at the front side of the observatory building
  • Reproduction of the blockworks and quarry stone