June – July 2021 14.07.2021Construction Journaladmin As of July 14, 2021 the following works have been done: demolition works, repair of the building facade, walls refining from old plastering , walls smoothing, walls plastering, partition laying, interior wall lining with MULTIPOR thermal insulation