Interior works:
– thermal insulation of facade window jamb;
– walls plastering;
– walls caulking;
– floor installation;
– laying of electric cables;
– installation of boilers and boiling equipment;
As of October 25, the following works are conducted:
Exterior works:
– flue gas stack has been installed;