September 2021

As of 18.09. 2021 the following works are conducted:
– basement and boiler room walls and window jamb thermal insulation;
– making door apertures and installation of metal partitions;
– laying of the following engineering networks: heat supply, water supply, power supply and sewage;
– thermal insulation of staircase walls;
– installation of boiler and boiler room equipment.

Leave a Reply

Your email address will not be published. Required fields are marked *